Project, Quantity Take-Off and Shop Drawing

Stone support from architectural design to execution drawings

Project, Quantity Take-Off and Shop Drawing

Quantity take-off, cladding pattern and execution drawings (DWG/PDF) for architects and contractors.

Free above 1,000 m²

The success of natural stone projects starts before cutting: the right pattern, the right joint and the right floor plan. Our technical office takes the architectural project and, after choosing the stone, nesting the slabs and calculating quantities and wastage, prepares the execution drawings.

Deliverables

  • Stone quantity take-off and wastage analysis (Excel + PDF)
  • Slab layout and vein-continuity map
  • Shop drawings: façade, floor, stairs (DWG/PDF)
  • Joint and anchor detail drawings
  • Piece label list and packing plan

Process

Within five working days of receiving the project file we send the first quantity take-off and preliminary layout. After approval the shop drawing is prepared and the production order is issued from it. The service is free on orders above 1,000 m²; for smaller projects a reasonable technical-office fee applies.

Software and file formats

Our technical office works with DWG, DXF, IFC and PDF files and delivers outputs in the same formats plus Excel quantity tables. If the architect wishes, the slab layout can be seen overlaid on their own project. In revisions updated drawings are delivered within 48 hours.

Scope of service

  • Quantity and wastage analysis
  • DWG/PDF execution drawings
  • Vein-continuity map
  • Free above 1,000 m²

Project, Quantity Take-Off and Shop Drawing — get a quote

Fill in the form and we will get back to you as soon as possible.

Frequently asked questions

What is the minimum order quantity?
We suggest one container (12–15 m³) for blocks, about 500 m² for slabs and 200 m² for cut-to-size products. We can offer special arrangements for samples and small first orders.
Can I get samples?
Yes. We send 30x30 cm sample tiles free of charge; the courier cost is for the buyer. For large projects we also prepare an A4-size finish comparison set.
What is the lead time?
Slabs in stock are ready in 7 days and made-to-order production in 3–5 weeks. Sea transit takes 9–14 days to Europe and 12–18 days to the Gulf.
What are the payment terms?
Usually 30% in advance and the balance against shipping documents (T/T) or by letter of credit (L/C). For new customers an L/C and insurance are recommended.
How are slabs selected and tones checked?
Slabs are photographed and numbered one by one. In large projects block-to-block matching is done and loading follows the buyer's approval. You may also select on site at our plant.
WhatsApp +90 272 555 48 00 export@petrovatas.com.tr